Live specialists · Mon–Fri 9 AM–8 PM · Sat 12–5 PM (CST) Call or text 832-509-5009

Before you order

Pergola requirements.

Want to cover your pergola? Most existing pergolas are ready for a polycarbonate roof. Check these five points — or text us a few photos and we'll check them for you.

Know the parts

Rafters, purlins & slope.

Rafters are the large main boards of your pergola. Purlins (also called stripping or shade slats) are the smaller boards that run across the top of the rafters — the roof panels rest on them.

Roof panel Purlins Rafter Low-side overhang Slope — water runs this way

The checklist

Five things to check.

Slope

The roof must tilt so rain runs off. More slope is always better.

Hercules
1/4″ drop per 12″
Apollo
1″ drop per 24″

Rafter spacing

The distance between the main boards, center to center.

Hercules
Matched to panel width
Apollo
24″ or less

Purlin spacing

The smaller boards the panels rest on. Closer is stronger.

Hercules
36″ max · under 19″ for 139 mph
Apollo
16″ or less

Low-side overhang

Panels extend slightly past the low edge so water drips clear.

Hercules
1″–3″ past last clip
Apollo
1/2″–3″ past the edge

Next to a house wall

Panels expand in the heat — leave a gap and add flashing.

Hercules
Up to 1/8″ per 4′ of length
Apollo
1/4″ (12′) · 1/2″ (longer)

Requirements from the manufacturer's installation manuals. Always follow the manual for your system — see videos & manuals.

Common situations

Not quite ready? Easy fixes.

Flat pergola

  • Add lateral shims on the rafters or purlins to create slope
  • Or use doorstop shims on the purlins
  • Don't move existing rafters to change slope

Purlins too far apart

  • Add extra boards between them to reach the spacing
  • Replace any rotted or damaged wood
  • Refresh the stain before the roof goes on

Not sure about your pergola?

Send us 3 photos. We'll check it.

Text a photo of the whole pergola, one of the top framing, and your length and width. We'll tell you which system fits.